Client: McConnell Dowell (Australia)
Form of contract: Commissioning Engineering
Contract period: Sep-2023 to Mar-2024
Project description:
- Build O&M Procedure for all system: MV/LV Switchboard, Transformer, ICSS,
PAGA/Radio/Telephone system, HVAC, Crane, Metering system, Fire Water system etc., - Build Cable Schedule, Subsystem Marked-up, Cable Block Diagram
- Build Commissioning Procedure for MV/LV Switchboard, Transformer, ICSS, PAGA/Radio/Telephone system, HVAC, Crane.








